HomeBlogRepair
Repair

Container Painting: From Rust Removal to Topcoat

Paint is the first and most important layer protecting a steel freight container from rust. Over years of salty sea air, rain and cargo impacts, the coating gets scratched and blistered, and the steel underneath starts to corrode. This guide explains how containers are protected at the factory, what repainting involves and what to watch out for.

When does a container need painting?

  • Once corrosion starts. Where the paint has come off, the bare steel rusts; as rust advances the sheet thins and can be holed. Local rust should be cleaned and painted before it spreads.
  • After repairs. Welding, panel replacement or straightening damage the coating; these areas are protected again as part of the repair.
  • When preparing for a new use. A container that will serve as a store, workshop or office is often fully repainted inside and out; the colour is chosen at this stage.

How are containers painted at the factory?

New containers are protected at the factory by a paint system built up from several coats: a primer that bonds to the steel and inhibits rust, with coats on top that stand up to the weather. Coating manufacturers base system selection on ISO 12944, the standard for protecting steel against corrosion with paint.

One major change in the industry was driven by the environment: in 2016 China's four largest container manufacturing groups began switching from solvent-based to waterborne paint because of new rules to cut emissions of volatile organic compounds (VOC). The changeover was planned to start on 1 July 2016 at factories in South China and on 1 April 2017 in the rest of China.

ISO 12944: environment and durability classes

ISO 12944 ties the choice of paint system to two questions: what environment will the steel be in, and how long should the coating last?

  • Corrosivity category (environment): atmospheric environments are rated C1 to C5, with CX for the most extreme conditions; separate Im categories cover immersed or buried surfaces.
  • Durability: four classes describe the expected time from first application to the first major maintenance painting: low (L) up to 7 years, medium (M) 7–15 years, high (H) 15–25 years and very high (VH) more than 25 years.

Surface preparation: half the job

How long paint lasts depends largely on the surface underneath. Paint applied over rust, loose old paint, salt or grease soon blisters. The cleanliness of steel surfaces is defined in ISO 8501-1, and the cleaned surface is compared with the reference photographs in the standard:

  • Abrasive blast cleaning (sandblasting): Sa 1 is light, Sa 2 thorough and Sa 2½ very thorough cleaning. Sa 3 brings the steel to a visually clean state: mill scale, rust and foreign matter are removed completely.
  • Hand and power tool cleaning: St 2 is thorough and St 3 very thorough cleaning, done by scraping, wire brushing and disc sanding.

Repainting step by step

  1. Condition survey. First the container's structural condition is checked: a holed, dented or rotten panel is repaired before painting. Paint should never hide structural damage.
  2. Cleaning. Salt, grease and dirt are washed off.
  3. Removing rust and old paint. Blast cleaning or tool cleaning, depending on the scope of work; the grade is specified according to ISO 8501-1.
  4. Primer and topcoats. The paint system is chosen for the environment the container will be used in and applied according to the manufacturer's instructions.
  5. Masking and markings. Before painting, door seals and the CSC plate are masked; under the CSC rules the markings on the plate must be permanent and legible (see our CSC guide). On a container that stays in transport use, the identification number and other markings are reapplied after painting (ISO 6346).

Floor and interior surfaces

Container floors are usually marine plywood treated with chemicals that protect against insects. If the floor has to be sanded or cut, wear a dust mask, gloves and long sleeves. When converting a container into an office or living space, preparing the interior surfaces should be planned together with insulation and lining; see our container office conversion guide.

Painting at Uskont

At Uskont, painting is part of two services. In container repair, surface preparation, rust removal and a protective coating suited to marine conditions are one step of a repair carried out to IICL standards. In modification projects, the container is painted for its new use. Examples:

  • Interior and exterior painting: a complete repaint of a container the customer uses as storage on their own site.
  • Paint and windows: only paint and two windows for a 40' container to be used in building a garden home; the customer completed the rest.
  • Shelving and painting: a workshop and store for a university student club, including transport.

To assess the container you want painted, get in touch.

Sources

Get a Quote for Your Container

+90 212 853 8 853  ·  uskont@uskont.com  ·  WhatsApp: +90 212 853 8 854

Get a QuoteWhatsApp
Uskont Assistant BETA
Hello! I can answer questions about container inspection, repair and modification. For pricing, I will connect you directly with our team.